{"page":{"id":66,"title":"Cancel or Change an Order","handle":"cancel-change-order","url":"https://sneakmuse.com/cancel-change-order/","body_html":"<p class=\"policy-updated\">Last updated: <time datetime=\"2026-11-20\">November 20, 2026</time></p>\n<p>Every SneakMuse item is made to order, so there is a short window in which an order can still be cancelled or changed free of charge. This page explains that window and what to do after it has passed.</p>\n<section class=\"policy-summary\">\n<h2>At a glance</h2>\n<ul>\n<li><strong>Free cancellation:</strong> within 24 hours of placing the order.</li>\n<li><strong>Free changes:</strong> size, design, product type or shipping address, within the same 24 hours.</li>\n<li><strong>How:</strong> email <a href=\"mailto:support@sneakmuse.com\">support@sneakmuse.com</a> with your order number and &#8220;Cancel&#8221; or &#8220;Change&#8221; in the subject line.</li>\n<li><strong>After 24 hours:</strong> the order is in production and can no longer be cancelled or changed; you can return or exchange it within 60 days of delivery.</li>\n</ul>\n</section>\n<h2>1. Cancelling an order</h2>\n<p>Email us within 24 hours of the order confirmation email. We cancel the order and refund the full amount to the original payment method within 7 business days. The time of your email counts, not the time we read it.</p>\n<h2>2. Changing an order</h2>\n<p>Within the same 24 hours we can change the size, swap the design or product type, or correct the shipping address. If the change makes the order cost more, we email you the difference to approve before production; if it costs less, we refund the difference.</p>\n<h2>3. After the 24-hour window</h2>\n<p>Once production has started the item is being made in your size and cannot be stopped. When it arrives you can return or exchange it within 60 days under the <a href=\"/returns-exchanges-policy/\">Returns &amp; Exchanges Policy</a>; return postage for a change of mind or a wrong size is paid by you.</p>\n<h2>4. Address corrections after dispatch</h2>\n<p>After a parcel has been dispatched the address can no longer be changed by us. If the parcel comes back because the address was wrong or incomplete, we send it again once you confirm the correct address.</p>\n<h2>5. If we need to cancel</h2>\n<p>If we cannot produce an item you ordered, or a payment cannot be confirmed, we email you and refund anything you paid in full within 7 business days.</p>\n<h2>6. Contact</h2>\n<p>Email <a href=\"mailto:support@sneakmuse.com\">support@sneakmuse.com</a>. We reply within 1 business day, Monday to Friday, and read cancellation and change requests first. Related pages: <a href=\"/refund-policy/\">Refund Policy</a>, <a href=\"/shipping-delivery/\">Shipping &amp; Delivery</a>.</p>\n","visible_characters":2041,"meta_description":"Cancel or change a SneakMuse order free of charge within 24 hours of ordering. What can be changed, how to ask, and what happens once production starts.","parent":null,"published_at":"2026-10-06T04:24:15+00:00","updated_at":"2026-11-20T11:18:37+00:00"}}